Orem Quality Drywall hangs and finishes drywall on new houses, additions, and builder frames in Orem, UT. The city still has infill lots, and immediately west, Vineyard has been adding whole streets of new housing, so a share of the work we see is a first hang on a fresh frame rather than a patch in a mid-century house. Ceilings are hung first, then walls. Finish level and texture are agreed in writing. After we review plans or walk the framed house, we send a price with labor, material, and dates. A typical hang in central Utah County sits around $1.50–$3.50 a square foot, moving with board type, height, and the level of finish.
Orem Quality Drywall also covers new-construction hanging and finishing in Provo, Lindon, Pleasant Grove, American Fork, and Vineyard.
Get the numbers you need to plan with confidence—no pressure, just clear and honest pricing.

On a new Orem house we board the ceilings, then the walls, and we keep joints off the corners of openings when the framing gives us that choice. Baths get moisture-resistant panels. Type X goes where a rating is on the plans. Most painted rooms are finished to Level 4; Level 5 is the better call when the walls will be smooth or glossy, or when a large window washes a wall with light. Texture is the pattern you picked, not a leftover from the last house on the street.
Share the drawings, the finish level, the texture, and the date you need the painters in. You get a bid with labor and material separated, plus a hang-and-finish calendar the other trades can work to. If the house is not yet heated, finishing waits. Mud needs a room held at 50°F or higher while it cures, which matters on winter frames and on basement levels that have not had a furnace running. An owner-builder gets the same breakdown; we will also list what has to be complete — inspections, mechanical rough-in, a weathertight shell — before we start.
A new wing or a bonus room that lands on a 1970s or earlier wall has to pick up the existing texture and the existing finish at every joint. That match is part of the bid, not a favor at the end. Scera Park and the older State Street grid produce a lot of this work: a new family room behind a house that already has orange peel in one room and a later knockdown in another. We will tell you which plane we are matching before the first sheet goes up.
Garages are often finished to a lower level than the living space, but the wall between the house and the garage still has to be the assembly the layout requires, taped and closed. Lower levels on new Orem and nearby new-build lots are a clean hang if the slab is dry and the mechanicals are set. If you want the garage and the house billed as one sequence, say so; it is usually cleaner than bringing a second crew back later.
Square footage, finish level, and dry time set the pace. A small addition is shorter than a whole house. Coats still need to cure, so a “one-week house” is only realistic if the heat is on and the hang is already done. The calendar on the bid is the one we will hold, and it will move if framing or mechanical work is still changing.
We would rather start when the house is ready than begin in a shell that still has open walls. If you have a firm move-in, work backward from paint, not from the day the last stud goes up. Winter inversions in the Utah Valley make unheated basements slow; build that in.
Framing, rough mechanical, and the inspections that belong before drywall should be far enough along that we are not boarding a wall that still has to move. We check punches in the framing, confirm the board list, and protect floors before the first sheet.
01 — Plans and a walk of the frame. We confirm finish, texture, and dates, then write the price and the calendar.
02 — Prep. Floors are covered. Framing, boxes, and any damp spots are checked before board goes up.
03 — Hanging. Ceilings first, then walls, with the board each room actually needs.
04 — Tape, sand, and texture. Coats cure between passes. The pattern is the one on the bid.
05 — Punch and cleanup. We walk the finish, fix marks, and turn the rooms over for primer and paint.
01. Does Orem Quality Drywall bid for builders and for people building their own house?
Yes. Orem Quality Drywall prices new houses, additions, and basement finishes from plans, and will separate labor and material when a general contractor wants that format.
02. Which finish level should a new Orem house use?
Level 4 for most painted rooms. Level 5 for smooth or glossy walls, or rooms with hard side light. Garages are often Level 2 or 3.
03. Can you finish a new house in winter?
Yes, if the space is heated and stays at 50°F or higher while the mud cures. If the heat is off, finishing should wait.
04. How do you handle a house next to all the new construction west of Orem?
The hang is the same trade. Access, HOA rules, and tight lot staging may differ, and those notes go on the bid after we see the lot.
05. When should the hang start relative to inspections?
After framing and rough mechanical are far enough along that the walls will not change. We will not start just to hold a slot on a calendar.
Phone (385) 334-3646 or use the quote form. Orem Quality Drywall will come look at the framed house or the plans and send a written price and schedule before a sheet goes up.